A jobsite photo is useful only if you can find it later.

Capture photos with the project, area, activity, date, GPS, and related field record already attached.

Try the Photo Workflow

Or customize it to your own workflow

We’ll use this app as a model and build yours from your description or file.

Stop treating the camera roll as project documentation.

A photo named IMG_8472 tells the office almost nothing.

BizAppKit can store each photo with:

  • Project

  • Area

  • Date and time

  • GPS

  • Crew member

  • Activity

  • Caption

  • Tags

  • Related report

  • Related T&M ticket

  • Related inspection

  • Related issue

  • Related punch item

See photos captured in context.

Capture the photo and where you took it.

Photos attach to the record they document. A GPS stamp on the report shows how far the crew was from the project address when they filled it in.

Report → photos → GPS stamp

The photos and location section of a daily report with a map, a GPS stamp 37 meters from the expected location, and four photos.

Require a photo where it matters.

Mark an inspection item as needing a photo, and it is not satisfied until one is attached.

Photo required → photo attached → requirement satisfied

A failed inspection item with Photo Required checked, two photos attached, and Requirement Satisfied showing true.

Show the work before and after.

Keep the photo of the problem next to the photo of the fix, on the item they belong to.

Before photo → after photo

The before and after section of a punch item with one photo of an electrical panel as found and one after the fix.

Screens from the app, with sample data. The photos are illustrations.

Capture photos in context.

Instead of taking the picture first and explaining it later, crews take photos directly from the record they are working on.

Daily Report

Progress photos stay with the day’s report.

T&M Ticket

Evidence stays with the extra work.

Inspection

Failed checklist items keep their photos.

Punch List

Before and after photos stay together.

Work without a connection.

Photos and field records can be captured offline and synchronized later.

The crew does not have to wait for a signal before documenting the work.

Find the evidence later.

Filter by:

  • Project

  • Date

  • Area

  • Type

  • Activity

  • Employee

  • Issue

  • T&M ticket

  • Inspection

The goal is simple: when somebody asks what happened three months ago, the answer should take seconds rather than an afternoon.

Turn jobsite photos into project records.

Try the Photo Workflow